Stormwater management / Underground systems

Underground Stormwater Systems

Manage runoff below ground and keep valuable surface space available. Explore modular detention, infiltration, and water storage with GRAF EcoBloc and project support from BARR Plastics.

EcoBloc modular stormwater system installed below a usable surface GRAF EcoBloc modular underground stormwater system
The fundamentals

What is an underground stormwater system?

An underground stormwater system collects runoff and holds it beneath the surface. Depending on the site design, the water can infiltrate into surrounding soil, be released at a controlled rate, or be stored for later use.

The right approach depends on the site's drainage objectives, soil conditions, groundwater, loading, and local requirements.

Make room for what happens above ground.

Place stormwater storage below parking areas, landscaping, and other usable surfaces, subject to project specific structural and installation design.

Start with your objective

What does your site need to do with runoff?

EcoBloc can be configured for different stormwater functions. Choose the application that matches your project.

01 / DETENTION

Hold it, then release it

Temporarily store runoff during a storm and release it through a designed, controlled outlet.

Explore detention applications →

Infiltration suitability and any storage for reuse must be evaluated as part of the complete site design.

GRAF EcoBloc Inspect Smart modular stormwater block Featured system / GRAF EcoBloc
The modular solution

Meet GRAF EcoBloc

Interconnected plastic modules form a below ground reservoir sized and arranged for the site's storage needs.

EcoBloc gives designers a modular approach to detention, infiltration, and harvesting, with component options for inspection access and project specific configurations.

  • Modular layout
  • High void storage
  • Inspection access options
  • Lightweight components
  • Traffic area applications*
  • System accessories

* Loading, cover, burial depth, and module selection require project specific engineering review.

Why modular

Built around the site, not a fixed tank shape

Use the surface

Keep above ground areas available for other site functions.

Configure the footprint

Arrange modules around available dimensions and storage targets.

Plan for access

Include appropriate inspection and maintenance provisions in the design.

Match site loads

Select the module and installation detail for anticipated loading.

Move components efficiently

Modular elements simplify transport and handling on many sites.

Scale with demand

Size the reservoir to the required volume and available space.

System overview

How the system manages stormwater

The hydraulic path depends on your site's design and the application selected.

01

Collect

Runoff enters from drainage infrastructure.

02

Pretreat

Specified upstream measures help manage sediment and debris.

03

Store

Water enters the underground modular reservoir.

04

Manage

Water infiltrates, leaves through an outlet, or is held for reuse.

05

Maintain

Designed access points support inspection and upkeep.

Project support

From site constraints to a workable system

BARR Plastics supports engineers, developers, contractors, and municipalities with system selection, design assistance, supply, and installation guidance.

01 / Define the need

Share location, drainage objective, required volume, and project stage.

02 / Review the site

Consider footprint, depth, soil, groundwater, and loading.

03 / Select the system

Review module options, connections, access, and configuration.

04 / Plan delivery

Coordinate components and logistics with the project schedule.

Go deeper

EcoBloc product and design resources

Use these BARR resources to review the system, available components, design information, and project support.

Common questions

Underground stormwater systems FAQ

What is the difference between detention and infiltration?

Detention temporarily stores runoff before a controlled release. Infiltration stores runoff while allowing it to soak into suitable surrounding soil. A site assessment and local requirements determine which approach fits.

Can EcoBloc be installed beneath a parking area?

EcoBloc has options for trafficked areas. The right module, cover depth, installation detail, and loading must be checked for each project.

Can an EcoBloc system be inspected?

Inspection access can be incorporated using compatible system components. Plan inspection and maintenance access during the design stage.

What does BARR need to review a project?

Start with the site location, intended application, target storage volume if known, available footprint, depth limits, loading requirements, project timeline, and any site plans or drawings.

Does BARR provide design and installation support?

Yes. BARR describes consultation, system selection, design assistance, product supply, and installation guidance for EcoBloc projects. Contact the team to confirm the scope needed for your site.

Start your project

Planning an underground stormwater system?

Send BARR your project location, drainage objective, drawings, and required volume if available. The stormwater team can help you assess an EcoBloc configuration for your project.

Final system sizing, geotechnical suitability, loading, and compliance require project specific professional review.

LET'S WORK TOGETHER

CONTACT DETAILS

CALL TOLL FREE: 1.800.665.4499




OUR FACILITY

VISIT US:
31192 South Fraser Way, Abbotsford, BC V2T 6L5, Canada
GET DIRECTIONS
WORKING HOURS:
8AM - 5PM, Mon - Fri

REQUEST A QUOTE

PERSONAL DETAILS
CONTACT INFORMATION