Project Team (Gabriola)
Architect: Johnston, Davidson Architects
Mech Eng.: Flow Consulting
Supplier: Barr Plastics
Installer: Mount Benson Mechanical
Project Team (Central Saanich)
Architect: Johnston, Davidson Architects
Mech Eng.: Flow Consulting
Supplier: BARR Plastics
Installer: Kinetic Construction
Standard
SWM City Policy
BARR Product
Factory built galvanized steel tanks with epoxy lining and engineered seismic tie down systems.
The Projects
Gabriola : 4 – 3750 USG Galvanized steel epoxy lined tanks for toilets, vehicle wash and emergency water supply.
Central Saanich: 5 – 3718 USG Galvanized steel epoxy lined tanks for toilets, vehicle wash, tanker ll and emergency supply.